XPLAN · Energy renovation
Façade, windows, heating or ventilation: choosing the right financing starts with the owner and the type of investment. This guide connects funding calls with practical examples for houses, common parts of buildings and business premises.
Targeted update on 6 November 2026: evidence of lawful building status, full funding call identifiers and 119SUB-LS24. The remaining information retains its verification date of 3 November 2026.
Several different financing routes may be available for the same building. This does not mean that you can combine a façade grant, a loan with 0-percent interest and a principal write-off for the same invoice. The applicant, measure and costs must be checked against each funding call.
Grant
Part of the eligible costs is reimbursed if the conditions are met. Both the percentage and the cap apply.
Loan
Borrowed money must be repaid. The nominal interest rate does not reflect all borrowing costs.
Loan with a principal write-off
Under 88KOH-PO26, part of the approved principal may subsequently be written off. The write-off is not 40% of the investment value.
Start with your situation
A “commercial building” and “multiple owners” are not mutually exclusive. In a jointly owned commercial building, a joint application may be relevant for the façade, while a different route may apply to the windows of an individual office.
First establish ownership, actual use and the scope of the measure.
Private individual as investor
Individual investment · check the type of premises and whether ownership is held outside business activities
Common parts of a building
At least 3 residential or business units · joint investment
Business investor
A company or another eligible business entity · its own investment
The diagram points you towards the relevant funding call; it does not confirm eligibility. A business co-owner participating in a shared façade renovation should also check the middle branch. For a loan with 0-percent interest charged to the reserve fund, do not use the conditions of the closed 128VSSRS26 call.
Mixed use and business premises owned by an individual
For a mixed-use building, the label “commercial” or “residential” is not sufficient. We separately check the owner, individual unit, shared measure, actual and permitted use, and the property’s accounting treatment.
- 126SUB-OB26: in certain cases, it also allows business premises privately owned by individuals. Property recorded among a sole trader’s fixed assets is not treated as an individual’s private property for this purpose; invoices must be issued to the individual. For heat substations, façade insulation and floor insulation (measures D, F and H) in business premises, an additional condition applies: the same measure must not be eligible for a grant under another funding call. These exceptions do not automatically apply to the 89OB26 loan.
- 118FS-PO24 for sole traders: the building must be commercial in both its intended purpose and its actual use. An office in a residential house therefore cannot automatically be treated as an eligible commercial building.
- 88KOH-PO26: this is intended for non-residential buildings. The permitted scope and any proportional allocation of costs must be checked for the specific case; a business-use share alone does not establish the eligibility of a mixed-use building.
126SUB-OB26, 1, 3 and 4.a; 118FS-PO24, 2; 88KOH-PO26, 4.3 and 7.3.
The main financing routes in one place
The funding calls below were open on the date checked. The amounts are upper limits, subject to the conditions being met. They do not indicate how much funding remains available.
Change in October 2026: 87OB26 is closed; since 28 October 2026, the current call has been 89OB26, with a fixed interest rate of 2.0%. Previous interest rates do not automatically apply to a new application.
Private individual as investor
| Funding call | Who it is for / scope | Support | When to apply |
|---|---|---|---|
| 126SUB-OB26 | Private individuals; individual measures in a building with lawful status. Additional requirements for an older building apply to windows and building envelope insulation. | Façade of a single-family or two-family building: up to 40%, capped at €35/m². Timber windows: up to 40%, capped at €300/m². | After completion; investments from 1 March 2026 onwards. |
| 89OB26 | Creditworthy individuals without business activities. | €1,500–€100,000; fixed rate of 2.0%. Generally up to 10 years, or up to 20 years for at least three measures or nearly zero-energy buildings (sNES+). The limit applies to an individual building or an individual unit in a multi-unit residential building and includes all Eko sklad loans approved for that building or unit in the three years before the application is submitted. Multiple applicants cannot multiply the limit for the same investment. | The investment must not be fully completed when the application is submitted; invoices must not be fully paid when the application is decided. |
Common parts of a building
| Funding call | Who it is for / scope | Support | When to apply |
|---|---|---|---|
| 124SUB-OBPO25 | Common parts of an older building with 3+ residential/business units. | Façade: up to 30%, capped at €50/m²; for a high-rise building, €60/m² (the definition is explained below). Different caps apply to roofs/floors; heating optimisation: 50%. | Before completion; a joint application under the funding call’s rules. |
| 127SUB-SOG26 | Shared heating or hot water for at least 3 units in an older building. | 40% of eligible costs; a qualifying heat pump, biomass system, solar thermal system or heat substation. | Before the investment is completed. |
| 81OBVSS25 | A creditworthy private individual without registered business activities who is a unit owner. | €1,500–€15,000; nominal rate of 0.0%, up to 10 years. No more than the owner’s share minus the grant. | After the grant award decision becomes legally final, but before the measure is fully completed; the loan deadlines must also be observed. |
Business investor
| Funding call | Who it is for / scope | Support | When to apply |
|---|---|---|---|
| 118FS-PO24 | Eligible business entities; sole ownership is required for a joint investment involving 3+ units. Building envelope (A–D): an older building; measures E–N: an occupancy permit issued before 1 January 2023. | Up to 30%. Façades, floors exposed to outside air below, and flat roofs: capped at €35/m²; ground floors, floors above unheated spaces, pitched roofs and ceilings below attics: capped at €20/m². | After completion; investments from 1 January 2023 onwards. |
| 83PO25 | Eligible legal entities and other forms of business specified in the funding call. | €25,000–€2 million; up to 85%. Baseline fixed rate of 0.5% or three-month EURIBOR + 1%; up to 15 years. | Before the investment is completed. |
| 88KOH-PO26 | An eligible business owner/co-owner of an older commercial building. | €100,000–€5 million; up to 85%. Base interest rate of 0%; conditional write-off of up to 40% of the approved principal. | Before the investment starts; at least a 20% reduction in specific primary energy demand. |
VAT is not an eligible cost under 124SUB-OBPO25 and 127SUB-SOG26. Under 118FS-PO24, 83PO25 and 88KOH-PO26, VAT may be eligible if the applicant has no right to deduct it. Under 81OBVSS25, the calculation basis includes VAT; for other residential funding calls, use their respective definitions of recognised costs. Do not compare amounts across financing routes using different tax bases.
Businesses: the percentage is not the only limit
118FS-PO24, the financial benefit under 83PO25, and aid to business beneficiaries under 124SUB-OBPO25/127SUB-SOG26 are also assessed under the de minimis rule: a maximum of €300,000 in aid to a single undertaking over the last three years. Linked companies, other aid received, sectoral exclusions and cumulation must be taken into account. For a preferential loan, the aid amount is not the same as the full principal; Eko sklad calculates it when the aid is awarded.
88KOH-PO26 uses a de minimis or State aid scheme. Under the latter, the baseline aid intensity is 25% of eligible costs for one measure or 30% for two or more; any increases are subject to additional conditions. The limit applies to the aid, including the interest benefit and the principal write-off, so the maximum write-off is not guaranteed. 118FS-PO24, 5.f; 83PO25, 5.d; 124SUB-OBPO25, aid to business beneficiaries; 127SUB-SOG26, aid to business beneficiaries; 88KOH-PO26, 6.
Under 124SUB-OBPO25, a high-rise building means that the floor of the highest storey that can be occupied is more than 22 m above ground level at the intended operational or setup area for fire service vehicles. 124SUB-OBPO25, 2.b.
How do the financing routes connect?
A solid green arrow indicates a possible combination if the conditions of both funding calls are met. A dashed red connection flags the issue of financing the same costs.
↔89OB26
→81OBVSS25
↔83PO25
✕88KOH-PO26
A business co-owner participating in a shared façade renovation should also check the branch for common parts of buildings. Allocation to different measures and costs requires a separate assessment.
Can we obtain both a loan and a grant?
Under some routes, yes. Under others, the wording of the grant funding call limits the combination, even if the loan funding call permits certain forms of cumulation. Joint projects require a table showing: owner → measure → cost → funding source.
Combining support: the same costs or separate measures — 126SUB-OB26 + 89OB26
| Combination | Assessment | What to watch for |
|---|---|---|
| 126SUB-OB26 + 89OB26 | Possible subject to conditions | A loan and a grant for an eligible individual measure, with their combined amount not exceeding the recognised costs. First apply under 89OB26, then carry out the work and draw down the loan as required, and finally apply under 126SUB-OB26 after completion. Amounts already paid cannot be financed by the loan. |
| 124SUB-OBPO25 / 127SUB-SOG26 + 81OBVSS25 | Possible for a private individual who is a unit owner without registered business activities | A personal loan for the owner’s remaining share after the grant, once the grant award decision is legally final. This is not a joint loan taken out by the building manager. |
Combining support: the same costs or separate measures — 118FS-PO24 + 83PO25
| Combination | Assessment | What to watch for |
|---|---|---|
| 118FS-PO24 + 83PO25 | Possible subject to the conditions of both funding calls | 118FS-PO24 expressly permits an Eko loan. The combined amount must not exceed eligible costs, unless the grant is used exclusively for partial repayment of the loan. Apply under 83PO25 before completion and under 118FS-PO24 after completion. If, when the loan is approved, the applicant has already received or applied for other public funding for the same eligible costs, or has reached the aid ceiling, the interest rate under 83PO25 is adjusted to the reference rate. When planning a later grant application, also check the conditions of the specific award decision and contract; do not automatically assume a rate of 0.5%. |
| 124SUB-OBPO25 + 127SUB-SOG26 | Separate measures on the same building | The façade and a shared heating installation may be covered by different applications. The same costs, such as controls, must not be counted twice. |
Combining support: the same costs or separate measures — 124SUB-OBPO25 + 88KOH-PO26 for the same façade
| Combination | Assessment | What to watch for |
|---|---|---|
| 124SUB-OBPO25 + 88KOH-PO26 for the same façade | Do not plan on combining the support | 124SUB-OBPO25 excludes a new grant for a measure for which an Eko sklad grant has already been awarded, and prohibits other public funding for the same costs. Under 88KOH-PO26, the right to a principal write-off is approved together with the loan. An interest rate adjustment under 88KOH-PO26 does not in itself remove these restrictions. |
| 127SUB-SOG26 + 88KOH-PO26 for the same heating costs | Do not plan on combining the support | The same obstacle applies: the prohibition on double funding under 127SUB-SOG26. |
Combining support: the same costs or separate measures — 124SUB-OBPO25 + 127SUB-SOG26 + 88KOH-PO26, separate measures
| Combination | Assessment | What to watch for |
|---|---|---|
| 124SUB-OBPO25 + 127SUB-SOG26 + 88KOH-PO26, separate measures | A case-specific assessment is required | Separate bills of quantities and invoices are not the only requirement. The measures financed by the loan under 88KOH-PO26 must themselves achieve at least a 20% reduction in specific primary energy demand. Applicants, the principal write-off and State aid must be checked. |
| 118FS-PO24 + 88KOH-PO26 | No automatic combination | For the same measure, 118FS-PO24 prohibits a further Eko sklad grant, while entitlement to the write-off under 88KOH-PO26 is approved together with the loan. Our assessment: do not include an additional grant under 118FS-PO24 alongside such a write-off in your financing plan without written clarification. The loan exception alone does not permit double grant funding. |
Sources: 118FS-PO24, 5.l–m; 83PO25, 4.a; 124SUB-OBPO25, 4.i; 127SUB-SOG26, 4.k; 88KOH-PO26, 5.1.b, 6.3 and 8.i; 81OBVSS25, loan following the grant award decision; 126SUB-OB26, combining a loan and a grant. If the allocation remains unclear, request written clarification for your specific cost plan.
Façade, windows, heating and ventilation
Can we insulate only part of the external walls?
The renovation scope must be technically sound and comply with the selected funding call. Under 124SUB-OBPO25, the exemption from preparing detailed construction design documentation (PZI) for an apartment building with no more than eight individual units applies only where the measure covers the building as a whole; in that case, renovating only part of the façade is not eligible.
This exemption does not automatically apply to an exclusively commercial building. For a partial renovation, we check the design solution, thermal bridges, fire safety and the conditions for common or special common parts. Under 88KOH-PO26, a partial scope must also achieve the required energy performance together with the other measures financed by that loan. 124SUB-OBPO25, pp. 1–3 and 5; 88KOH-PO26, 4.1.
126SUB-OB26 / 89OB26
A building’s legal status and age are separate conditions. Under 126SUB-OB26, measures E–H (timber windows and building envelope insulation) must be carried out on an older building: the starting point is a building permit for construction or a change of use issued before 1 July 2010, or the evidence specified in the call for an appropriately legalised older building.
For façades and floors, restrictions on the building type or a specific exception for business premises owned by individuals also apply. Measure D of 89OB26 likewise sets permit and age requirements, with separate provisions for later extensions, additional storeys and reconstruction. Envelope requirements do not automatically apply to all heating or ventilation measures. 126SUB-OB26, 1 and measures E–H; 89OB26, 3.D.
118FS-PO24
Under 118FS-PO24, measures A–D (envelope insulation and windows) are available only for an older building as defined in that call: the starting point is a building permit issued before 1 July 2010, or other acceptable evidence specified in the call. For measures E–N, the occupancy permit must have been issued before 1 January 2023.
Previously unheated buildings or parts, buildings intended for resale and buildings that are not business assets used for business activities are excluded. Calls 124SUB-OBPO25 and 127SUB-SOG26 also exclude previously unheated parts. 118FS-PO24, 1; 124SUB-OBPO25, 1; 127SUB-SOG26, 1.
Triple-glazed PVC windows: when can they receive support?
| Funding route | Requirements for windows |
|---|---|
| 126SUB-OB26 – private individuals | The measure provides grants for timber windows in an older building. Triple glazing alone does not make a PVC window eligible. |
| 89OB26 – personal loan | PVC is not excluded as a material; external windows and doors must meet U ≤ 1.0 W/(m²K). The conditions concerning the building’s age and permits, and the other requirements of measure D, also apply. |
| 118FS-PO24 – windows in business premises | PVC may be eligible in an older building: Uw ≤ 1.0 W/(m²K) and compliant installation. Specific requirements for timber apply to residential measures. |
| 88KOH-PO26 – business building renovation | PVC may be eligible: Uw ≤ 0.9 W/(m²K), triple glazing, a spacer with ψ ≤ 0.060 W/(mK), and window joint sealing in three layers. All loan conditions also apply. |
| 124SUB-OBPO25 – shared façade | Windows and entrance doors serving common areas are listed among the façade costs. This is not a standalone grant for all office or apartment windows. |
Uw is the thermal transmittance of the whole window. The Ug value stated for the glazing is not the same value. The quotation should specify the exact model, performance characteristics, area and installation method. 126SUB-OB26, measure E; 89OB26, external windows and doors; 118FS-PO24, technical conditions D; 88KOH-PO26, technical requirements D.
A heat pump and an existing gas boiler
An electric heat pump can be the sole heat source or part of a coordinated hybrid solution. Before selecting it, we check heat losses after the envelope renovation, the operating temperatures, electrical connection capacity, noise and controls. Under 127SUB-SOG26, suitable electric or sorption heat pumps may meet the conditions for a joint investment.
Under 88KOH-PO26, new fossil-fuel appliances, including those using natural gas, are not eligible costs. Retaining an existing gas boiler is not the same as purchasing a new gas heat pump. 127SUB-SOG26, measure C; 88KOH-PO26, eligible and ineligible costs.
For private individuals under 126SUB-OB26, the higher level of heat pump support is conditional on replacing an old combustion appliance serving the central heating system. For air/water heat pumps, it is up to 50%, capped at €4,500; for water/water or brine/water heat pumps, it is up to 50%, capped at €8,000. Without this replacement, the lower limits apply: up to 20%, capped at €1,000 or €3,000, respectively. 126SUB-OB26, support amounts.
Replacing the old heating appliance
The higher heat pump grant requires the actual replacement and destruction of at least one old combustion appliance. The appliance must be in use and connected to the central heating system at the time of replacement. A photograph before removal and a photograph immediately after removal, before refurbishing the room or installing the new heat pump, are required, together with a declaration of destruction.
If you retain the only existing combustion appliance in a hybrid system, you do not meet the condition for the higher support. If there are several old appliances and any remain, an appropriate chimney sweep inspection report is required for each retained appliance. Other exclusions in the call also apply; simply removing a room heater or an old electric heating appliance is insufficient.
If you claim support for both measure B (a wood biomass combustion appliance) and measure C (a heat pump), the higher support for replacing an old combustion appliance is granted for only one measure. 126SUB-OB26, measure C and mandatory attachments.
Decentralised or central ventilation?
Funding does not determine the best technical solution. For a central system, we check duct routes, ceilings, space for the unit, penetrations through fire compartments and noise. For a decentralised system, we check external walls, penetrations, electricity supply, airflow rates and the participation of individual owners. Units with alternating supply and extract airflow may have to be installed in synchronised pairs.
126SUB-OB26 supports central and decentralised ventilation with different caps; 118FS-PO24 and 88KOH-PO26 have their own technical requirements. 127SUB-SOG26 is a call for shared heating appliances, so it should not be treated as a general ventilation grant. 126SUB-OB26, measure I; 118FS-PO24, technical conditions H; 88KOH-PO26, technical requirements E.
88KOH-PO26: why 0% and 40% are not yet a financing plan
The call requires at least a 20% reduction in specific total primary energy demand. This is not the same as a 20% reduction in the gas bill. The baseline and planned conditions are compared using suitable energy calculations based on a comparable methodology. Only measures financed under 88KOH-PO26 are counted.
The planned condition must also meet the requirements of the Slovenian Rules on the Efficient Use of Energy in Buildings (PURES-3). If the required savings cannot be demonstrated at completion, eligibility for the loan itself is at risk, not just the write-off.
If you finance the façade under 124SUB-OBPO25 and intend to finance windows and ventilation under 88KOH-PO26, you may not count the contribution of the façade, which is not financed by that loan, towards the required 20% savings when submitting the 88KOH-PO26 application. More measures may affect the permitted State aid intensity, but do not change the order in which applications are received. 88KOH-PO26, 4.1 and 6.1.
88KOH-PO26: borrower and building conditions
A building does not automatically constitute a single borrower. Under 88KOH-PO26, the minimum individual loan is €100,000 and the minimum eligible investment costs are €117,650. For a co-owner, their eligible share and creditworthiness must be checked. The existence of a building manager or reserve fund does not in itself establish that the manager may combine all owners into one 88KOH-PO26 loan. We do not promise this without confirmation for the specific ownership and borrowing structure.
88KOH-PO26 applies to older business buildings that are not intended for residential use. The permit conditions must be checked: the starting point is a permit issued before 1 July 2010 or an admissible legalisation route, together with an occupancy permit issued before 1 January 2023. The applicant must carry on their own economic activity in the building or the relevant part of it; previously unheated buildings and buildings intended for resale are excluded.
Under 88KOH-PO26, also check the location. Investments in Natura 2000 areas and sites on UNESCO’s list of World Natural Heritage are not eligible. This is an exclusion criterion that we check before commissioning the energy assessment documents. 88KOH-PO26, 7.1.
88KOH-PO26: conditions for the write-off
The write-off of up to 40% relates to the approved loan and is limited by State aid rules. The investment must be fully paid for, delivered and in use; the required calculated energy performance certificate (REI) must demonstrate the energy performance achieved. The full investment value must have been capitalised as fixed assets, with depreciation already being charged.
Where a building permit was required, an occupancy permit is also required. The complete final report and write-off request must be submitted no later than 30 days before the end of the repayment moratorium; entitlement lapses after this deadline. The moratorium lasts 6 months from the date the loan enters repayment, with a justified extension bringing the total to no more than 12 months.
If other public funding is requested or received for the same eligible costs, the base interest rate of 0% is adjusted to the reference rate under the call’s rules. Even at 0%, valuation, notary and loan security costs may remain. 88KOH-PO26, 5.1–5.2.
Restrictions on renting and leasing
Landlords require an additional assessment. Under 88KOH-PO26, the construction products, appliances and equipment financed by the loan may not be removed, sold, rented out or leased to third parties for at least three years after completion; thereafter, prior written consent is required until the loan is repaid.
Under 83PO25, the restriction on fixed assets financed by the loan applies until repayment, unless Eko sklad gives prior consent. This is not a general statement that no premises may be let; obtain written confirmation of eligibility for the specific rental investment before placing an order. 88KOH-PO26, 1 and 8.h; 83PO25, 5.c.
Calculate insulation, grants and loan repayments
Choose what you would like to check. The calculation is free and does not require your personal details.
Version history – text overview
The first calculators were published on 3 July 2026. Version 1.1.0 was published on 7 November 2026; version 1.2.0 was published on 8 November 2026. The dates on which funding conditions were checked are listed separately.
Version 1.2.0
Published: 8 November 2026
- Consistent initial navigation to anchors and correct initial state.
- Consistent mobile offsets and a concise version history.
- Separate 88KOH-PO26 business scenario with a moratorium and conditional principal write-off.
Version 1.1.0
Published: 7 November 2026
- Larger main result and correctly formatted units.
- The result appears before the collapsed input summary.
- Copied and printed results include all inputs and the tool version.
- Open the version and its changes beside the tool heading.
First release
Published: 3 July 2026
- Initial public release of Xplan calculators.
What is new in the calculators?
The first calculators were published on 3 July 2026. Version 1.1.0 was published on 7 November 2026; version 1.2.0 was published on 8 November 2026. The dates on which funding conditions were checked are listed separately.
Version 1.2.0
Published: 8 November 2026
- Consistent initial navigation to anchors and correct initial state.
- Consistent mobile offsets and a concise version history.
- Separate 88KOH-PO26 business scenario with a moratorium and conditional principal write-off.
Version 1.1.0
Published: 7 November 2026
- Larger main result and correctly formatted units.
- The result appears before the collapsed input summary.
- Copied and printed results include all inputs and the tool version.
- Open the version and its changes beside the tool heading.
First release
Published: 3 July 2026
- Initial public release of Xplan calculators.
JavaScript is required for the interactive forms. Explanations and static examples are provided below; you can also use Eko sklad’s official tools.
- Façade with λ = 0.035 and no existing insulation: calculated minimum 17.5 cm, rounded up to a whole centimetre: 18 cm.
- 81OBVSS25 loan: EUR 15,000 over 120 months at 0% nominal interest: monthly payment EUR 125.00; other costs are separate.
- Basic grant for an ordinary shared façade under 124SUB-OBPO25: for EUR 180,000 excluding VAT and 1,000 m², a maximum of EUR 50,000.
These are calculation examples, not confirmations of eligibility. Source conditions checked on 6 November 2026.
Help me choose
Choose the first tool for insulation thickness, the second for monthly personal loan repayments and the third for the basic maximum grant for the entire shared façade. You do not need salary details, ownership information or a funding call number to start a calculation.
For companies and other business entities, choose the separate 88KOH-PO26 business module. The two personal loans for individuals do not apply to it.
The initial figures in the loan and grant forms are sample data. Change them as needed before calculating your own scenario.
Checking insulation thickness for a grant
The supported grant routes are 126SUB-OB26 and 124SUB-OBPO25. Selecting a loan in another tool does not change these insulation rules.
Enter your data and select “Calculate thickness”.
How is the insulation calculated?
For a new layer, dmin = λ/threshold. Calculations use metres; results are shown in centimetres. The λ/d thresholds are 0.200 for façades, 0.140 for roofs and 0.280 W/(m²K) for supported floors. This is a criterion for the insulation layers, not the U-value of the entire construction.
For eligible retained façade insulation, Rold = dold/0.045 and dmin = max(0, λnew × (1/0.200 − Rold)). For several new layers, add R = Σ(dᵢ/λᵢ). The arithmetic mean of λ is not suitable. Existing roof and floor insulation is not counted in this grant calculation. Loan call 89OB26 has its own rules, including a special provision for old roof insulation that this grant calculation does not implement.
The material selection is not an installation recommendation. Fire safety, compressive strength, moisture, the system and design suitability require separate assessment. Sample λ values are not guaranteed product properties.
Personal loan repayments and costs
Calculate the loan for your share of a joint renovation
The building’s total investment is not transferred into a personal loan. Enter only your own verified amounts; individual owners’ shares are not necessarily equal.
Enter the loan amount and term, then select “Calculate repayments and costs”.
Creditworthiness, age and loan security restrictions are checked separately. We do not collect these details for the calculation. Official indicative creditworthiness tools: for employees · for pensioners.
How is the loan calculated?
For principal P, an integer number of months n and a monthly rate i = r/12, the annuity payment is P × i / (1 − (1 + i)−n). At 0%, it is P/n. The annuity payment covers principal and regular interest. It excludes the annual fee.
The monthly repayment schedule rounds interest and payments to cents and adjusts the final payment. This can create a small difference from the unrounded AN × n model; the displayed totals follow the displayed schedule. The insurance calculation base is the unrounded AN × n and includes regular interest. The premium and other monetary items are rounded to cents.
The account management fee is estimated as the annual fee × n/12. Actual charges depend on calendar years and the agreement date: pro rata in the first year, then annually. The model does not calculate drawdown dates, interim interest, phased drawdown or specific contractual terms. It does not calculate the APR. The APR measures costs using the timing of cash flows; it is not a sum of percentages.
Basic grant for a shared façade – 124SUB-OBPO25
Enter the eligible costs and area.
How is the grant calculated?
The basic maximum is the lower of 30% of eligible costs excluding VAT and the area cap: EUR 50/m² for an ordinary building or EUR 60/m² for a high-rise building. Only this indicative maximum is deducted from net costs; VAT and any ineligible costs remain. The calculation is not an award decision.
Business renovation · 88KOH-PO26
A planning calculation for business entities under this call. It is not a universal calculator for all business support and does not confirm eligibility. Business renovation conditions and procedure.
Enter costs, the loan amount, total term and write-off scenario, then select calculate.
Business model assumptions and limitations
We assume that the planned approved loan and the fully drawn loan both equal L, and that the write-off takes effect before the first regular principal repayment. At 0%, the baseline payment is L / (N − M). The schedule rounds payments to cents and adjusts the final payment. This simple scenario does not apply once repayments have started or where the loan is only partly drawn.
A write-off does not reduce the initial funding required and is not paid into a bank account. Its date and any change to the payment or term are set by an amendment to the loan agreement. Entitlement and implementation depend on the decision, requirements and a timely final report; the request must be submitted no later than 30 days before the moratorium ends.
The total term must not exceed the investment payback period stated in the application; this requires an individual check. The model does not assess State aid or de minimis rules, creditworthiness, loan security, lawful building status, energy requirements or available funding. Other public funding or exceeded aid limits lead to a rate adjustment under 5.1.b. The existing insulation calculator does not confirm technical compliance with 88KOH-PO26 either. For co-ownership, enter only the relevant share of the specific applicant.
What do the percentages mean in euros?
The following examples illustrate the calculations. They assume that the stated costs are eligible. They do not constitute an aid award or a contractor’s quotation.
Shared façade under 124SUB-OBPO25
Eligible costs excluding VAT: €180,000.
Area of new insulation: 1,000 m².
A standard building, not a high-rise.
30% of costs = €54,000.
1,000 m² × €50 = €50,000.
The lower limit applies. The basic remaining amount is €130,000, plus VAT and any ineligible costs. Special provisions based on social circumstances are not included.
Business building renovation under 88KOH-PO26
Eligible costs: €300,000.
One eligible, creditworthy applicant.
85% loan = maximum €255,000.
Other funding sources = at least €45,000.
40% of €255,000 = maximum €102,000.
If the full 40% write-off were actually approved and granted, the remaining principal would be €153,000. The aid actually permitted may be lower. VAT and other ineligible costs are not included.
€300,000 and eight business co-owners with equal shares
Each co-owner’s share of the costs is €37,500, and 85% of that amount is €31,875. This is below the minimum loan of €100,000 under 88KOH-PO26. The shares must not automatically be added together into a joint loan simply because they concern the same building. The eligible borrower and their investment must first be identified.
The most important deadline may fall before you order the works
The sequence depends on the call
The sequence depends on the call
Funding route · Application / start · Practical implications
88KOH-PO26
Before starting
Before work starts or the first legally binding commitment that makes the investment irreversible, such as an equipment order or a works contract. Whichever occurs first applies. Design work, permits and preliminary studies do not count as the start. The investment must not be completed before the decision is issued.
124SUB-OBPO25 / 127SUB-SOG26 / 83PO25
Before completion
Apply for an investment that has not yet been completed. This is not a recommendation to start without checking the conditions and supporting evidence.
89OB26
Before completion and payment
The measure must not be fully completed when the application is submitted. Invoices must not be fully settled when the decision is made; amounts already paid are not financed by the loan.
118FS-PO24 / 126SUB-OB26
After completion
Prepare invoices, proof of payment, photographs and documentation for the appliances or materials. The eligible implementation date differs between calls.
81OBVSS25
After the grant award decision
A legally final decision is required; the measure must not be fully completed when the loan application is submitted. The loan covers the owner’s remaining share.
ZER
After the agreement takes effect
Work may start only after the tripartite agreement takes effect.
Deadlines after approval are also binding — 124SUB-OBPO25 / 127SUB-SOG26
Deadlines after approval are also binding
Funding call · Key deadline after the decision or agreement
124SUB-OBPO25 / 127SUB-SOG26
Completion within 15 months of the decision becoming final in administrative proceedings. A demonstrated objective obstacle may justify an extension of up to 6 months; the request must be substantiated before the deadline expires. Complete evidence of implementation must be submitted no later than 2 months after the completion deadline expires. If justifiable reasons are demonstrated in time, Eko sklad may extend the documentation deadline by up to 1 month. If complete documentation is not submitted by the applicable deadline, entitlement to the support lapses.
83PO25
The agreement must be signed within 3 months of the decision being issued; an extension of up to 3 months is possible for justifiable, substantiated reasons. The investment must be completed within 2 years of the decision being issued; the final disbursement must be made no later than 3 months after the completion deadline.
Deadlines after approval are also binding — 89OB26
Deadlines after approval are also binding
Funding call · Key deadline after the decision or agreement
89OB26
The agreement must be signed within 3 months of the decision being issued; a substantiated written request submitted before the deadline may allow an extension of up to 1 month with Eko sklad’s consent. Completion is required within 12 months of signing the agreement, with an extension of up to 12 months possible upon a timely, substantiated request. Evidence must reach the bank no later than 7 days after the applicable completion deadline expires; otherwise, drawdown is at risk.
81OBVSS25
The agreement must be signed within 3 months of the loan decision being issued; a justified extension of up to 1 month is possible with consent. Drawdown requires evidence that the investment is being implemented; the implementation and documentation deadlines in the grant award decision under 124SUB-OBPO25/127SUB-SOG26 also apply. Missing these deadlines prevents disbursement.
Deadlines after approval are also binding — 88KOH-PO26 – agreement and implementation
Deadlines after approval are also binding
Funding call · Key deadline after the decision or agreement
88KOH-PO26 – agreement and implementation
The agreement must be signed within 3 months of the decision being issued, and no later than 28 February 2029. Implementation is required within 9 months of the agreement; an extension for objective reasons is limited to 3 months, with an absolute deadline of 31 May 2029.
88KOH-PO26 – drawdown
The final request must be submitted no later than 3 months after completion and no later than 31 August 2029; drawdown must occur within the contractual period and no later than 30 November 2029.
88KOH-PO26 – write-off
The complete final report and request must be submitted no later than 30 days before the moratorium ends. Completed construction works alone do not satisfy all the conditions for a write-off.
124SUB-OBPO25, 10; 127SUB-SOG26, 10; 88KOH-PO26, 5.1.c, 5.2 and 13.b–d; 83PO25, 8–9; 89OB26, 2 and 6.a; 81OBVSS25, 2 and 5.a. Always include additional and contractual deadlines in the schedule for the specific investment.
Design work is not an eligible cost under every funding route. Under 124SUB-OBPO25, detailed design documentation for construction (PZI) and supervision are listed as eligible costs; under 83PO25, design work and external supervision may be recognised. Under 88KOH-PO26, design and permit costs are not eligible. This is separate from permission to begin preparatory activities before applying.
What should you prepare for the initial application?
For every funding route, we first establish the investor’s identity, ownership and consents, the building’s legal status, the selected measure and evidence of its technical characteristics. The attachments required by the specific application form follow. Under 124SUB-OBPO25 and 127SUB-SOG26, the building manager submits the application if the building has one; otherwise, a common authorised representative of all beneficiaries does so. The designer can prepare the technical documentation, but this does not automatically make them the applicant.
124SUB-OBPO25 / 88KOH-PO26 / 118FS-PO24 / 126SUB-OB26
Evidence of lawful building status: requirements differ between funding calls
For 88KOH-PO26, ensure that the building permit and occupancy permit are available when preparing the application. Section 8.a provides for special cases: where an occupancy permit was not required by law, the funding call allows a building permit and certain other supporting documents. If the occupancy permit does not identify the land parcels, also attach the building permit. Where parcel identifiers differ, provide documentary evidence of parcel subdivision. Before submitting the application, obtain written clarification on any missing documentation for the specific building.
For 124SUB-OBPO25 and 127SUB-SOG26, prepare a copy of the building permit or occupancy permit for construction or change of use, together with any decisions on legalisation, permits for a long-standing building or decisions recognising a presumption that a building and occupancy permit have been issued.
If plot identifiers differ, evidence of subdivision is required. Point 4.a also allows a signed Declaration of Lawful Status and Use under criminal and financial liability; the declaration does not replace the building’s actual compliance with regulations. We therefore do not summarise the requirement as mandatory submission of both permits in every case.
An old building permit does not, by itself, establish the lawful status of every subsequent alteration. Its scope must be compared with the building’s actual condition, and later works assessed under the rules applicable to them. The applicant bears the burden of proof; Eko sklad may request further evidence and carry out subsequent checks. A formally complete application does not establish that all alterations are lawful.
88KOH-PO26, 8.a; 124SUB-OBPO25, 4.a–b, 8.b, 11; 127SUB-SOG26, 4.a, 4.e, 8.b, 12.
- Shared façade under 124SUB-OBPO25: the form and declarations, evidence of legal status, a list of beneficiaries and their shares, duly adopted owners’ decisions, authorisations, the contractor’s quotation with a technical bill of quantities, photographs and the required design documentation. Where PZI is mandatory, submitting only cover sheets and declarations does not mean that the drawings can be prepared later. The call provides exceptions; for a multi-apartment building with no more than eight units, the façade exemption is conditional on carrying out the measure in full. The complete PZI must be submitted within 15 days if requested by Eko sklad. Supervision must be provided for measures where it is required.
- 88KOH-PO26: in addition to ownership and legal status, evidence of the property’s use for the business activity, creditworthiness and loan security, a financing plan, aid declarations and the required environmental declarations (the principle of doing no significant harm to environmental objectives – DNSH, climate resilience and location-based exclusions), a calculated energy performance certificate or an admissible alternative assessment of the existing condition, the underlying energy calculations, a technical report and a statement of the proposed condition, and evidence for the individual measures.
- 118FS-PO24 and 126SUB-OB26: complete evidence of the measure already carried out. Photographs of concealed work and insulation thickness must be taken during implementation, not only when preparing the application.
This is an indicative list; the official form and attachments for the selected call determine the full requirements. 124SUB-OBPO25, 1 and 4.a; 88KOH-PO26, 8.a; 88KOH-PO26, Annex 2; 118FS-PO24; 126SUB-OB26.
Applications, order of receipt and funding
Under 88KOH-PO26, applications are processed in the order received. Including more measures does not give an application higher priority. The call allows missing information to be supplied, but an incomplete application does not guarantee a reservation of funds. Even a timely and complete application may be rejected if the regional allocation has already been committed. Order of receipt and availability of funds also matter under 124SUB-OBPO25. 88KOH-PO26, 12.a; 124SUB-OBPO25, 8.
Preparing an application promptly makes sense; submitting one without substantive information is not a reliable strategy. Missing documentation and the deadline for supplying it must be assessed under the specific call. A telephone estimate of the fund’s workload or an “open” status does not guarantee a reservation of funds.
How much funding has been announced?
The verified documents state the following funding allocations: 124SUB-OBPO25 €18 million, 127SUB-SOG26 €1.1 million, 118FS-PO24 €10.5 million, 83PO25 €3 million, 126SUB-OB26 €56 million, 89OB26 €20 million and 81OBVSS25 €1.6 million. These figures do not confirm how much funding remains available.
The total loan allocation under 88KOH-PO26 is €21,875,000: €14,285,714.28 for Eastern Slovenia and €7,589,285.72 for Western Slovenia. Funding for principal write-offs is included in this arrangement; it is not an additional amount to be counted again. Availability must be checked against the investment region and applications already received. 88KOH-PO26, 3; 83PO25, amendment dated 17 April 2026.
Special funding routes and calls that must not be confused
Energy poverty: ZER 2024 remains open for Western Slovenia; a separate ZER – EASTERN SLOVENIA call is open for Eastern Slovenia. Basic support covers 100% of eligible costs up to EUR 18,000 including VAT; an increase to EUR 19,800 is an exception for specifically approved costs.
Conditions on financial vulnerability, residence, ownership and feasibility apply. This is not a general grant for every owner. ZER 2024 and partial closure; ZER – Vzhodna Slovenija (Eastern Slovenia). Also check the current status on the ZER West page and the ZER East page. At the time of verification, the latter stated that decisions were expected to start being issued towards the end of 2026; an open call does not mean an immediate decision.
Under 124SUB-OBPO25 and 127SUB-SOG26, eligible recipients of social assistance may receive a higher grant for their co-ownership share. This must be properly indicated and evidenced in the joint application. The higher support does not extend to all other owners.
105SUB-sNESOB23 / 91FS-sNESPO21 / 113SUB-EPPO24
- 105SUB-sNESOB23: a special route for the construction or purchase of a new one- or two-dwelling nearly zero-energy building (sNES+), or comprehensive renovation of an older one to that standard. It requires a comprehensive solution, not just a standard façade renovation. If you apply under 105SUB-sNESOB23, you cannot also apply for an Eko sklad grant for individual measures on the same building under other funding calls, such as 126SUB-OB26; the exception is an installation for electricity self-supply.
- 91FS-sNESPO21: special business incentives for constructing new nearly zero-energy non-residential buildings. This is not a general route for a standard energy renovation of an existing business property; its conditions must be assessed separately from the individual measures under 118FS-PO24.
- 113SUB-EPPO24: support for businesses to undertake an energy audit or introduce an energy management system. An energy audit is not the same as a calculated energy performance certificate or detailed execution design documentation (PZI) for a façade.
Closed funding calls
Closed funding calls cannot form the basis of a new financing proposal. 128VSSRS26 for a loan repayable from the reserve fund: closure was announced on 21 August 2026. 87OB26 has a published closure date of 27 October 2026; the current call is 89OB26. 114SUB-OB24 is also marked as closed. Previous interest rates and conditions therefore cannot be carried over to new applications.
New applications can no longer be submitted under 128VSSRS26.
119SUB-LS24 — grants for local authorities
119SUB-LS24 is open as of the targeted verification date. It is intended for local authorities investing in buildings they own or co-own; co-ownership requires the written consent of the other owners. It also covers the building envelope, windows, heating and ventilation. The grant amounts to up to 40% of eligible costs including VAT, subject to additional caps depending on the measure. Applications are submitted after the investment has been completed; check the requirements concerning the building’s age and permits, together with the required supporting documents.
For other public buildings, standalone solar power installations, energy storage systems and other investments, check the separate programmes in official list of all funding calls. The list provides an overview; also verify the status on the page for each individual call.
How do we prepare a renovation that can be financed and delivered?
- Identify the investor and the building. Owners, ownership shares, use, building manager, legal status and existing documentation.
- Compare up to three suitable scopes of work. For example, the building envelope, the envelope with heating, and a more comprehensive renovation including ventilation. Needs, feasibility and running costs determine the choice.
- Check energy performance and financing. Under 88KOH-PO26, do this before commissioning the works; where there are several owners, also assess their borrowing options separately.
- Prepare coordinated designs and bills of quantities. The façade, windows, mechanical systems and necessary electrical installations must work together.
- Coordinate applications, quotations and implementation. Identify the responsible persons, required evidence, construction supervision and final claims.
First, we assess your building and the scope of renovation.
Xplan can prepare design documentation, coordinate the necessary disciplines and, within the agreed scope, assist with the application, contractor selection, project management and construction supervision. We define the scope of services and responsibilities before work is commissioned. Eko sklad decides whether to award support.
Official sources and verification date
This overview is based on publicly available funding calls and annexes verified on 3 November 2026. For every application, check the latest consolidated text, amendments, form and status again. This information guide does not replace an award decision or an individual assessment.
- 124SUB-OBPO25 — shared building envelope, costs, documentation and combinations
- 127SUB-SOG26 — shared heating systems
- 88KOH-PO26 — loan, principal write-off, energy and procedure
- 88KOH-PO26 — Annex 2, technical requirements
- 118FS-PO24 — grants for business entities
- 118FS-PO24 — technical conditions
- 83PO25 — business loan
- 83PO25 — amendment dated 17 April 2026
- 126SUB-OB26 — grants for private individuals
- 89OB26 — current loan for private individuals
- 81OBVSS25 — personal loan for shared building parts
- ZER 2024 — documents and partial closure
- ZER – VZHODNA SLOVENIJA — consolidated text
- 119SUB-LS24 — grants for local authorities