Eko sklad PZI documentation supports the preparation of energy renovation projects for apartment buildings in Slovenia. At Xplan, we design façade and roof renovations and insulation to ceilings above unheated basements. Clear drawings and construction details help building managers and apartment owners prepare an investment they intend to submit to Eko sklad.
The design brings together existing conditions, proposed measures and information for construction. It helps the client compare quotations for the same scope of work and gives the contractor clear guidance for implementation.
Eko sklad PZI documentation for façades, roofs and basement ceilings
Façade energy renovation
We consider the façade system, insulation type and thickness, and construction details. Particular attention goes to the plinth, openings, window sills, balconies and connections to other building elements. We adapt the solution to the actual building and the planned renovation.
Flat or pitched roof renovation
For roofs, we coordinate the proposed layers, thermal insulation, waterproofing and key junctions. The design also considers drainage and the connection between roof and façade. Where an intervention affects the load-bearing structure, we identify the need for additional structural assessment.
Insulation above unheated basements
For floors above an unheated basement, we design insulation to the underside of the ceiling. We consider available headroom, existing services and connections at walls. This helps define the work before contractors prepare their quotations.
What can the documentation include?
We agree the scope after reviewing the building, proposed measures and requirements of the selected public call. Depending on the project, we can provide:
- a review of available drawings and a site visit;
- a technical report describing the proposed solutions;
- the necessary drawings, sections and construction details;
- material specifications and building element build-ups;
- a bill of quantities for obtaining comparable quotations;
- technical information for coordination with the building manager and contractors.
By agreement, design can be combined with construction supervision. Read more about our drawings and approach on the PZI construction documentation page.
Preparing an investment and Eko sklad application
Eko sklad PZI documentation must suit the particular intervention. Required documents, technical conditions and application timing differ between public calls. Check the current conditions on the official Eko sklad website. Eko sklad decides eligibility and the amount of any financial support.
For a wider overview, see our guide to preparing an apartment building for energy renovation.
Planning an apartment building renovation?
Send a short description of the building, the proposed measures and any available drawings. Let us know whether you are renovating the façade, roof, basement ceilings or several elements together. We can then propose a suitable documentation scope and prepare a quotation. Send an enquiry about your project.
