Structural PZI design – calculations and structural drawings
At XPLAN, we prepare structural PZI documentation. We coordinate structural calculations with formwork and reinforcement drawings, construction details and the required material schedules. The documentation scope depends on the structural system, project stage and available information.
Design in three dimensions (3D) helps review geometry and identify conflicts between elements. A model does not replace checks on input data, calculation assumptions and drawings. We use modern design technologies and coordinate the documentation with the other responsible designers.
What should you know?
What is PZI construction documentation?
PZI is the design documentation for carrying out construction. It defines technical solutions, materials and construction details for the proposed work. Structural PZI documentation connects calculations with drawings and provides the basis for constructing the structure. Its scope must be coordinated with the building and the other project disciplines.
Why choose XPLAN for your PZI design?
At XPLAN, we coordinate structural calculations, the structural model and construction drawings. We review the project information with the client and coordinate solutions and open questions with the other responsible designers. Checking the inputs and clearly presenting details for the contractor are important parts of the work.
How is PZI construction documentation prepared?
Preparing a PZI construction design requires detailed analysis, design and coordination. We begin by developing a thorough understanding of the project objectives and the client’s requirements. This is followed by an analysis of the site, available materials and structural solutions. Based on this information, we prepare the PZI structural design with the relevant calculations, drawings and specifications within the agreed scope. We coordinate it with the designs for other disciplines as required by the project.
Key steps in preparing PZI documentation include:
- Collecting and analysing all the necessary information and documentation.
- Preparing the draft construction design, including drawings and technical specifications.
- Coordinating with the client and adjusting the design in response to feedback.
- Final preparation of the PZI documentation for construction.
Why is PZI construction documentation so important?
Coordinated drawings and details help the contractor understand the proposed solution and reduce the risk of misunderstandings, further clarification and rework. Calculations, drawings and material schedules also support bills of quantities, quotations and construction checks.
PZI documentation may include:
- 3D views and details of the building modelled in three dimensions, making the PZI documentation easier to understand
- Detailed 2D projections, floor plans and sections for the PZI design
- Detailed structural calculations and analysis of loads and structural reactions
- Material schedules, such as reinforcement quantities, concrete quantities, timber and roof structure schedules. These include the required installed dimensions and quantities. They support the preparation of bills of quantities and help the client or contractor obtain quotations and order construction materials.
Would you like our quotation?
Complete the contact form below and tell us as much as possible about your project. One of our experienced specialists will contact you so that together you can identify the most suitable solution.
PZI in practice: calculations, formwork and reinforcement
Our two anonymised retaining-wall examples show the connection between existing conditions, the structural model, calculations, and formwork and reinforcement drawings. The drawings show proposed designs; they do not establish that construction has been completed.
The documentation is considered against applicable requirements, including the Slovenian Building Act (GZ-1). Tell us about your project, available drawings and preferred timescale so we can identify the information required and prepare a proposal.
